- 18
- 20
- 22
- 24
- 26
- 28
- 30
- 32
- mm
- inch
Vias are covered with soldermask and are not processed with HASL or ENIG. Boards with 6+ layers are upgraded to Epoxy Filled & Capped Via for free.
Soldermask is removed over the via and its annular ring. The via will be solderable and has the same surface finish as regular pads.
Boards with 6+ layers are upgraded to Epoxy Filled & Capped Via for free.
Vias should be at most 0.5 mm in diameter to avoid incomplete filling. Vias violating this size will be left unfilled.
Vias are filled with epoxy resin and then plated over with copper to create a flat, solderable surface. Ideal for via-in-pad, multilayer boards, and thick boards.
Vias should be at most 0.5 mm in diameter to avoid incomplete filling. Vias violating this size will be left unfilled.
Vias are filled with high thermal conductivity copper paste and then plated over to create a flat, solderable surface. The filling has an excellent heat conductivity of 8 W/m·K ideal for via-in-pad and heatsink pads.
Precision routing | OK | NG |
Example | ![]() | ![]() |
Description | Alignment holes at both ends of the board allow good positioning | Alignment holes off to one side of the board; position would be inaccurate |
1. PCB must contain alignment holes. (⌀ 1.0 mm minimum, circular, preferably non-plated)
2. At least 3 alignment holes are required.
3. Alignment holes should be placed across the PCB and not clustered together.
4. Individually routed boards need to be at least 50×50 mm for precision routing.
5. Boards in panels only need to satisfy the alignment hole diameter requirement to use precision routing.
Precision routing | OK | NG |
Example | ![]() | ![]() |
Description | Alignment holes at both ends of the board allow good positioning | Alignment holes off to one side of the board; position would be inaccurate |
1. PCB must contain alignment holes. (⌀ 1.0 mm minimum, circular, preferably non-plated)
2. At least 3 alignment holes are required.
3. Alignment holes should be placed across the PCB and not clustered together.
4. Individually routed boards need to be at least 50×50 mm for precision routing.
5. Boards in panels only need to satisfy the alignment hole diameter requirement to use precision routing.
ENIG surface finish is required for edge plating.
ENIG surface finish is required for edge plating.

- Charge Details
- Special Offer $2.00
- Via Covering $0.00
- Surface Finish $0.00
- Build Time
Build time refers to the period from the start of physical production (When MI starts in the "Production Progress") to production finished(ready to be sent to shipping center).
- ● PCB orders with standard parameters paid before 6 pm (GMT+8) from Monday to Saturday will enter production the same day, if no confirmation is needed.
- ● PCB orders paid after 6 pm (GMT+8) on Saturday will not be processed until the following Monday.
- PCB: 2 days $0.00
- 24 hours $7.20
-
24 hours
By choosing PCBA, you will receive free expedited PCB production service.PCBA Only $0.00
Additional charges may apply for special cases